|
Retrofitting of the level crossing installations Zeuthen and Eichwalde Projecting of the interlocking system adaptations in the relay interlocking systems for equipment of four railroad crossing safety installations with systems type SIMIS LC on the track section of Line S8 of the Berlin S-Bahn and the long-distance sector of the route Berlin – Cottbus. Period: 2008 |
Client DB AG |
Eisleben Adaptation of the railway crossing type SIMIS LC to the interlocking system E1278 with railway crossing control station at the traffic inspector's station. A level crossing with attendant and operator in the railway crossing control station at the traffic inspector's station. Period: 2009 |
Client DB AG, |
Großheringen New construction level crossing Großheringen station, HP/HP system, adaptation of the interlocking system and the level crossing at the all-relay interlocking station GS II. Period: 2009 |
Client DB AG, |
Rehfelde New construction level crossing Rehfelde HP/FÜ system, adaptation of the interlocking system and the level crossing on the mechanical interlocking system, type Zimmermann and Buchlo. Period: 2008-2009 |
Client DB AG, |
| Supplementary information material can be obtained from here. |
