deutsch  |  english  |  espaņol

Modernization of the traffic station Flensburg

Implementation planning for the new construction of the PA system, preparation of the control technology for the passenger information system and generation of the tendering documents with performance specifications.

Period: 2009-2010

Client

DB Station & Service AG

S-Bahn station Adlershof of S-Bahn Berlin GmbH

Preparation of the implementation planning for the telecommunication installations for the new construction of the S-Bahn platform with system technologies like ELA, FIA, BMA, RIS, video dispatch systems and cable installations.

Period: 2007-2010

Client

S-Bahn Berlin GmbH,
DB Station & Service AG

S-Bahn station Baumschulenweg of S-Bahn Berlin GmbH

Preparation of the implementation planning for the telecommunication installations for the new construction of the S-Bahn platforms with system technologies like ELA, FIA, RIS, LON and cable installations.

Period: 2007-2010

Client

S-Bahn Berlin GmbH,
DB Station & Service AG

New construction of a combined cycle power plant in Vlissingen,
The Netherlands

Planning, delivery, installation and commissioning of the information and safety systems. This included:

  • Networked telephone system (backed by an emergency power system) with structured cabling (LAN)
  • PA system for the entire plant
  • Video surveillance system with fixed and remote-controlled cameras
  • Access control system in the entire power plant and its accesses
  • Plant radio system in VHF band

Period: 2007-2009

Client

Kraftwerk Sloecentrale

Modification of the S-Bahn junction Ostkreuz, Berlin

Implementation planning for the modernization of the main junction buildings long-distance railway, ring line level and the platform Ro with commissioning of S-Bahn at Ro based on provisional constructions.
Here, ISV processed the planning stage implementation planning (performance phase 5 of the HOAI). Special focus was on the equipment of the platform Ro with telecommunication facilities.

Period: 2008-2009

Client

DB Projektbau

New construction of a steam power plant in Shuaibah, Saudi Arabia

Planning, delivery, installation and commissioning of the information and safety systems. This included:

  • Telephone installation backed by emergency power
  • PA system for the entire plant
  • Video surveillance system with fixed and remote-controlled cameras
  • Central clock system with radio-controlled main clock as well as secondary analogue and digital clocks

Period: 2007-2009

Client

Kraftwerk Shuaibah

NeiTech Allgäu, refurbishment of the route section Buchloe – Kaufbeuren

Implementation planning in accordance with HOAI (performance phase 5) for the OWG cable connection with adaptation of the present GSM-R system equipment. The following systems were processed:

  • Cabling installations (Cu and OWG)
  • Transmission technology (SDH/PDH)
  • Adaptation GSM-R transmission network
  • Switching technology from Cu connections to transmission systems for construction site clearance

Period: 2007-2009

Client

DB Station & Service AG

New construction of the combined cycle power plant in Sumgait, Azerbaijan

Planning, projecting and implementation work for equipping the power plant with a surveillance and communication system.

Period: 2006-2009

Client

Kraftwerk Sumgait

New construction of a biomass power plant in Moerdijk, The Netherlands

Planning, delivery, installation and commissioning of the information and safety systems. This included:

  • Telephone installation backed by emergency power
  • Video surveillance system with fixed and remote-controlled cameras
  • Access control system with no-contact readers and PC-assisted administration
  • Traffic control system for delivery vehicles
  • Measuring the moisture content of the fuel as well as integration of all data into a new monitoring software

Period: 2007-2008

Client

Kraftwerk Moerdijk

New construction of a biomass power plant in Lockerbie, Great Britain

Planning, delivery, installation and commissioning of the information and safety systems. This includes the telephone installation (backed by emergency power), as well as a video surveillance system with fixed and remote-controlled cameras. ISV also provides all replacement parts and warranty services.

Period: 2007-2008

Client

Kraftwerk Lockerbie

Barrier-free expansion of the S-Bahn stop Heimeranplatz, Munich

In the scope of the redesign and barrier-free expansion of the S-Bahn stop Heimeranplatz, ISV performed the implementation planning in acc. with HOAI (performance phase 5) for the telecommunication installations. This included the new construction and equipment of a distribution station for the central system technology (ELA) incl. power supply and cable connection installations, the installation of new loudspeaker equipment on the platform, relocation of the central PA system to the new distribution station as well as the adaptation, new installation and de-installation of route cabling and station cabling installations.

Period: 2007-2008

Client

DB Station & Service AG

S-Bahn Berlin, BOS tunnel radio system

Preparation of the implementation planning for the construction of a BOS tunnel radio system in the north-south tunnel of S-Bahn Berlin including involved systems like MAS90, BMA, SV.

Period: 2007-2008

Client

EADS

IC workshop Berlin Rummelsburg I, centre hall

Preparation of the implementation planning for the smoke and heat extraction installation.

Period: 2007

Client

DB Fernverkehr

End-of-train detection installation Hörlkofe station

Preparation of the implementation planning for TC installations, power engineering and traffic construction facilities for a video surveillance installation for end-of-train detection at Hörlkofen station.

Period: 2007

Client

DB Telematik

New construction of a gas and steam power plant in Hamm-Uentrup,
Germany

Planning, delivery, installation and commissioning of the information and safety systems. This includes an emergency power-backed telephone installation, a service-neutral data network based on OWG technology, a video surveillance system as well as an access control system with no-contact readers and PC-assisted administration.

Period: 2006-2007

Client

Siemens AG

New construction ICE depot Leipzig

Preparation of the implementation planning and invitation to tender for the fire alarm installations as well as the natural smoke and heat extraction facilities.

Period: 2006-2007

Client

DB Fernverkehr

Power plant Inesko in Belgium

Planning, delivery and commissioning of a video system (CCTV). Preparation of all installation documents as well as of a detailed documentation concerning the operation and maintenance of the facility.

Period: 2006-2007

Client

Siemens AG

Power plant Cologne/Niehl

Planning, delivery, installation and commissioning of the main communication installation type Stentofon. Preparation of all installation documents, drawings and user manuals as well as a detailed documentation for the operation and maintenance of the installation.

Period: 2005-2006

Client

Siemens AG

Expansion of the metro "Metrorrey" in Monterrey, Mexico

Planning and installation monitoring for the equipment of the underground railway with communication and surveillance systems as well as tunnel radio on connection with the expansion of the metro by one line.

Period: 2004-2005

Client

"Metrorrey" Monterrey

New construction of the gas and steam power plant in Salta, Argentina

Planning, projecting and implementation work for equipping the power plant with communication installations and a combined telephone and data network.

Period: 2004-2005

Client

Kraftwerk Salta

Supplementary information material can be obtained from here.